Feasibility evidence maps

Operations · purchasing · finance · facilities · management support

An evidence map that separates measured, calculated, estimated, unknown and contradictory information; not an investment recommendation.

Red flag to catch: A cost line with no figure is given a number or treated as estimated, an old source is treated as current, or a discussion is written as a permit.

Module 06Feasibility evidence maps
topicinformation heldstatus
Rack capacity2,400 pallets, not measuredcalculated
Floor area1,150 m² measured (technical note); 1,100 m² in the landlord's listingcontradictory
Floor load capacitythe note says "not confirmed"unknown
Permitdiscussion with the municipality only; no written permit applicationunknown
Permit status
In discussion with the municipality.
No written permit application made.
AI draftNo significant obstacle is expected in the permit process.
INTERNAL DRAFT · NOT SENT
DOCUMENTS ARE FICTIONAL

THE CASE IN THIS MODULE

The situation you work on

A fictional warehouse-lease file contains a measured floor area, a calculated rack capacity, a 2023 rent source, a landlord’s listing that gives a different floor area, a cost line that says "estimated" but gives no figure, and an unsettled permit.

WHAT YOU DO

  1. Give every input a topic name (for example floor area, clear height, rack capacity, floor load capacity, rent, investment amount, availability, permit); a topic may be split over two rows.
  2. Label each line measured, calculated, estimated, unknown or contradictory.
  3. End with three approval points and the evidence each needs; do not present a proposed owner as assigned.